Septic and Title 5 help in Sutton, MA
The Sutton Board of Health at 4 Uxbridge Road runs septic work in town, with its own rules on top of Title 5.

Good to know in Sutton
- Plan reviews can take up to 45 days. source
- Your installer has to hold a Sutton license.
- The construction permit and fee come before any digging.
- An approved plan can be extended once, for one year. source
Sutton’s Title 5 supplemental regulation, effective June 25, 2024, sets a maximum percolation rate of 60 minutes per inch, and says an acceptable perc test does not mean the lot is buildable. Perc and soils tests can be scheduled year-round, but the Board of Health has to issue a permit number first, and the applicant’s engineer must contact the Health Agent at least seven days before the requested date. A complete soils test, meaning both the soils evaluation holes and the perc test, is valid for two years. Sutton Title 5 supplemental regulation Once a system is being installed, the Board inspects it in stages: the excavation, the components (tanks, distribution box, pipe and stone), final grading, and stabilization. The licensed installer calls in each inspection, and the town asks for 48 hours’ notice. Inspections wait until rain or snow has stopped and the leachfield has dried. Sutton Board of Health procedures
Selling a house in Sutton?
Add it up: engineering, up to 45 days of review, then a licensed installer. Start well before your closing date. source
- Send the short form with your town and what you need.
- One septic company that works in Sutton gets it.
- They call or email you with a price. Saying no is fine.
Ask for a septic quote
Only one local septic company sees your request. We never sell your info.