Septic and Title 5 help in Holden, MA
Holden has its own septic rules on top of the state code. Where they differ, the town rules win.

Good to know in Holden
- Perc tests only happen in an open season the Board of Health sets.
- Groundwater within four feet of the surface makes a new lot unbuildable under town rules. source
- Reviews and inspections follow the Board of Health fee list.
- Parts of town have sewer. Check before you assume.
Holden’s supplemental rules ask for six feet between the bottom of the leaching facility and the “weeping water” mark, which is water seen entering an observation hole during the approved season. Leaching facilities must stay at least 25 feet from any failing perc test unless the applicant shows enough permeable soil inside that distance, and no reserve area should be proposed between the trenches of the main leaching area. The perc season usually runs December 15 to May 15, and the Board sets the dates each year. These rules are dated 1999, so ask the Health Agent whether they have changed. Holden Board of Health rules
Selling a house in Holden?
A winter fail can sit until perc season opens. Getting the inspection done early gives you room.
- Send the short form with your town and what you need.
- One septic company that works in Holden gets it.
- They call or email you with a price. Saying no is fine.
Ask for a septic quote
Only one local septic company sees your request. We never sell your info.